Voltmatic Energy Solutions

3kVA hybrid system

3kVA Hybrid Solar System in Tetu, Nyeri County

Project Details We completed the installation of a 3kVA hybrid solar system for a residential client in Nyeri County. The client had been experiencing frequent power outages and steadily rising electricity bills. Our solution delivered clean, reliable, and cost-effective energy to meet their daily power needs while significantly reducing their

10kva hybrid solar system

10kVA Solar Hybrid System Westlands, Nairobi Project

Project Details The client, a homeowner in Westlands, Nairobi, approached Voltmatic Energy Solutions seeking a lasting solution to two persistent problems: unreliable grid power marked by frequent blackouts, and excessive monthly electricity bills. Client Patel Vijay Location Shanzu Villa Estate, Westlands, Nairobi System Size (kW) 10 Total Project Cost(Ksh) 700,000

3kva solar hybrid system

5kVA Solar Hybrid System, Awendo,Migori Project

Project Details Located in the heart of Awendo, Migori County, this residential solar project was born out of the client’s urgent need to overcome persistent power blackouts and the burden of escalating electricity bills. With frequent outages disrupting daily life and productivity, the client reached out to Voltmatic Energy Solutions

5KVA Solar system installation at Brookview estate, Ruiru, Kiambu County

5kVA Hybrid System in Brookview 143

Project Details A client recently relocated to 143 Brookview Estate in Ruiru, only to be met with frequent and prolonged power outages. Frustrated by the constant disruptions and lack of reliable electricity, they reached out to us seeking a sustainable, long-term energy solution that would ensure continuous power for their

5kVA solar backup system

5kVA Solar Backup System in Garden Estate, Nairobi

Project Details At Garden Estate in Nairobi, consistent electricity isn’t a luxury — it’s a necessity. The homeowner reached out to us with a pressing concern: frequent power outages were putting the life of their grandmother at risk, as she depends on oxygen support that must run uninterrupted. Having seen the

Brookview 5kva system

5kW Solar System in Ukwala, Siaya

Project Details In Ukwala, Siaya County, a client faced frequent and prolonged blackouts that disrupted their daily life activities. Frustrated by the unreliable grid power and rising electricity costs, they sought a permanent solution to ensure consistent energy supply and reduce their expenses. That’s where we came in. Our goal was clear:

solar full kit

6kW Solar System in Kamangu, Kikuyu

Project Details In Kamangu, Kikuyu, we installed a 6kW hybrid solar system tailored to address the client’s energy challenges. This system provides reliable power, offsets energy bills, and offers grid independence during blackouts. Client Jackson Gathenya Location Kamangu, Kikuyu System Size (kW) 6 Total Project Cost(Ksh) 475,000 Installation Date 10-01-2025

7.5kw solar system

7.5kW Solar Power System in Kisian, Kisumu

Project Details In today's world, reliable power is essential for the smooth functioning of households and businesses alike. Persistent power shortages and high electricity bills causes significant disruptions and financial strain. We recently addressed these challenges for a client in Kisian, Kisumu county, by customising and installing a powerful 7.5kW

Brookview 5kva system

Kiratina 5kVA Solar System Project

Project Details Voltmatic Energy Solutions installed a 5kVA hybrid solar system for a client in Kiratina, Ruiru Sub-County.The client, who had grid power, was facing challenges with high electricity bills and frequent outages due to the unreliable power supply in the area where the transformer was being overloaded.Seeking a solution

Brookview 5kva system

5kVA Solar System in Ukwala, Siaya

Project Details In Ukwala, Siaya County, a client faced frequent and prolonged blackouts that disrupted their daily life activities. Frustrated by the unreliable grid power and rising electricity costs, they sought a permanent solution to ensure consistent energy supply and reduce their expenses. That’s where we came in. Our goal was clear: