Project Details In the remote area of Mijomboni, Malindi, Voltmatic Energy Solutions successfully delivered a fully off-grid solar energy solution to a client relocating from abroad. With no access to the national grid, our team designed and installed a robust 15kW off-grid solar system to power her entire home with
no responses
June 13, 2025
Project Details Located in the scenic hills of Ngong, this residential project required a reliable power solution for a home situated in an area with no access to the national grid. The cost of connecting to the grid—through the purchase of a transformer, poles, and wiring—was extremely high, making it
no responses
June 9, 2025
Project Details In the vast and remote wilderness of Mtito Andei, our client was building a new home and wanted to embrace clean, independent, and reliable energy. Given the high cost and poor reliability of the national grid in the region, the client chose not to connect to the utility
no responses
June 3, 2025
Project Details The client owned a rural home in Chavakali, located in an area with no nearby access to grid electricity. Kenya Power had quoted extremely high connection fees due to the distance from the grid infrastructure — making the option not only costly but time-consuming and unreliable.Having seen a
no responses
May 21, 2025
Project Details In May 2025, Voltmatic was engaged by a homeowner in Kisaju, Kajiado County, seeking a reliable and cost-effective power solution. The client’s home was located far from the national electricity grid, and upon inquiring with Kenya Power (KPLC), they were shocked by the high connection fees and infrastructure
no responses
May 13, 2025
Project Details A client in Katani struggled with an unreliable power system that failed to keep essential appliances, particularly their fridge, running consistently. Without access to the grid, frequent power interruptions led to food spoilage and frustration. Our team stepped in, assessed their needs, and installed a robust 5kW solar
no responses
February 20, 2025
Project Details In the heart of Kibwezi, Makueni County, we successfully installed a 5kVA off-grid solar system for a farm in the wild. The client sought a reliable energy solution to ensure round-the-clock power supply, eliminating reliance on the unpredictable grid. This solar system now powers their operations 24/7, providing
no responses
November 22, 2024
Project Details In Sobea, Nakuru County, we installed a 10kW off-grid solar system for a client who had no access to grid power. Frustrated by the high costs and delays from the national grid provider (KPLC), the client sought an alternative energy solution and found us through our social media
no responses
September 16, 2024
Project Details In a remote part of Nyahururu, Laikipia County, a client reached out to us seeking an alternative to the grid for her parents’ home.The area was not connected to the national grid, and residents were expected to pay a large sum to have the power infrastructure extended to
no responses
February 16, 2024